Beiyu Titanium

Titanium mill products and drawing-led supply

Titanium bar, plate, tube and forgings,
specified for the order.

Beiyu is a China-based titanium supplier supporting overseas industrial RFQs. We review bar, plate, sheet, tube, forgings, wire, billet and drawing-led components against the grade, governing standard, dimensions, inspection scope and release documents stated in the enquiry.

ASTM and AMS routes EN 10204 by order Drawing-led supply

Commercial coordination: Jiaxing · Technical supply coordination: Baoji · Responsible mill or fabricator and process route confirmed in the quotation. Representative footage.

Quotation basisWhat the quotation confirms
Product basisForm, dimensions, condition and quantity
Material identityGrade, standard, revision and heat or lot
Acceptance scopeMethod, criteria and inspection points
Release packageMTC, marking, reports and packing records
01 · Product basis

Start with the product form

The ordered form determines the governing specification, dimensional basis and practical supply route. These six routes cover most industrial titanium enquiries.

More titanium and drawing-led supplySpecialist materials, equipment and components View routes
02 · Material identity

Select material and standard together

An alloy name alone is not a purchasing specification. Begin with material behavior, then match the grade to the standard governing the ordered product form.

Titanium grade families

Commercially pureFormability to higher CP strength

General corrosion service and fabrication, with strength increasing from Grade 1 through Grade 4.

Strength and medicalAlloyed and low-interstitial routes

Higher-strength bar, plate, forgings, tube and drawing-led components when specifically ordered.

Corrosion servicePalladium-bearing and Ti-Ni-Mo routes

Selected against the actual corrosion environment; not automatic substitutes for Grade 2.

Standards and buyer inputs by product form

The standard sets the route; the RFQ still needs the dimensions, condition, quantity and document scope that control quotation.

Product routeCommon referencesBuyer detailsDocument notes
Sheet, plate and stripASTM B265 · ASME SB-265 · AMS 4911Thickness, width, length, condition and toleranceMTC and flat-product results by order
Bar and billetASTM B348 · AMS 4928Diameter or section, length, straightness and conditionHeat identity and mechanical results
Tube and pipeASTM B338 · B861 · B862OD, wall, length, route and test scopeNDT and pressure testing when specified
Forgings and fittingsASTM B381 · ASTM B363Drawing, allowance, condition and heat treatmentUT, PT or witnessed testing by order
Wire and welding wireASTM B863 · AWS A5.16Grade, diameter, condition and packagingLot identity and certificate scope
Inspection documentsEN 10204 3.1 · 3.2 when orderedValidation level, method and acceptance criteriaConnect records to the delivered heat or lot
Additional material familiesNickel, zirconium, refractory and clad routesView materials
03 · Acceptance basis

Define the selection basis before choosing a grade

An industry label is only a starting point. Begin with the operating environment or governing document, then confirm the product form, standard, acceptance and traceability scope.

Photography credits

Chemical processing · Desalination: Blueye, CC BY-SA 3.0 · Aerospace: NASA · Medical: Peter Kasprzyk, CC0 · Additive manufacturing: NIST · OEM machining: Beiyu supply-network photograph

04 · Release evidence

Evidence must connect to the delivered material

Inspection is useful only when the method, acceptance basis and resulting records are linked to the supplied heat, lot or item.

Mechanical test

TC4 tensile test report

Room-temperature tensile testing for a submitted TC4 sample, including tensile strength, proof strength and elongation.

Issuer
Hantang Test · Baoji
Criterion
GB/T 3621-2022
Method
GB/T 228.1-2021
Report
B25WT089293
Representative scan. Sample-specific, not an order certificate.

Representative third-party reports

Select a record to inspect the source scan and its stated method.

Define the release package before production

“Standard certification” is not a complete requirement. Name the document, validation level, method and traceability connection in the order.

Material identity

Grade, product standard and revision, plus heat or lot identity.

Material + MTC
Inspection document

Required EN 10204 type and the chemical or mechanical results to report.

3.1 or 3.2
Additional verification

PMI, UT, PT, dimensions or witnessed tests with method and acceptance criteria.

Method + criteria
Shipment connection

Marking, packing list and reports linked to the delivered material.

Traceable package

EN 10204 3.2 and third-party witnessing are included only when ordered.

Add document scope to RFQ
Third-party sample reportTC4 tensile test report
Third-party TC4 titanium tensile test report
Appendix A

Titanium standards and purchasing guides

Use these references to compare titanium grades, ASTM and AMS product standards, RFQ inputs, and MTC or EN 10204 document scope before quotation.

Appendix B

Questions that define a usable RFQ

These answers cover the information most often needed before material, inspection and release scope can be compared.

Which details should be sent before quotation?

State the product form, grade, governing standard and revision, dimensions, tolerance, surface condition, quantity, destination and required document package. Add the required date when schedule affects the supply route.

Can Beiyu quote drawing-based components?

Yes. Send PDF, STEP or CAD files with the drawing revision, material grade, critical dimensions, machining allowance, inspection points and quantity. Manufacturing and inspection scope are confirmed in the quotation.

What document scope should be stated?

State the required MTC or EN 10204 type, heat or lot traceability, and any PMI, UT, PT, dimensional reporting, witnessed testing or third-party inspection requirements before production.

Is there a fixed minimum order quantity?

The practical minimum depends on product form, grade, dimensions and the responsible supply route. Send the target quantity; any production-lot or minimum-order constraint is stated in the quotation.

When is the delivery schedule confirmed?

Lead time is confirmed after the material route, dimensions, quantity, required testing and document package are reviewed together. The agreed schedule is recorded in the quotation.

Does a sample report certify my order?

No. A sample report applies only to its identified submitted sample. The RFQ and purchase order must define the inspection certificate and reports connected to the delivered heat, lot or item.

Ready for technical review

Send what you know. We will identify what is missing.

Product, grade, dimensions or a drawing are enough to start. A complete specification is not required for the first enquiry.

Request for quotation

Tell us what you need

Add specification, company or delivery details Optional

Your details are used only to review and respond to this RFQ. The upload form accepts PDF, DWG, STEP and ZIP files. Privacy Policy. For access or deletion requests, email [email protected].
Scroll to Top